Yuba College
The Yuba College Library / Learning Resources Center reopened on January 13, 2014 after two-and-a-half years of transition. The remodeled 44,262 sq ft building features include 9 group study rooms, a cyber lab with an increased number of computers from 50 to 80, a training center and a lab, power and data access throughout the building, and open and welcoming spaces both for collaboration and individual study. Students describe the new facility as "spacious," "quiet," and “beautiful.” The $14M project was funded 50/50 by the Measure J bond and the state of California. Now all three campuses at Yuba College (Clear Lake, Sutter, and Marysville) have had their libraries built or remodeled within the last two years.